Revision history of "News:Basic definition OT-balance in project reports/sv"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 11:02, 16 December 2020TR (talk | contribs). . (506 bytes) (+11). . (Created page with "Övertidssaldodatumet måste vara ifyllt för att begreppet ska kunna räkna ut övertiden.")
  • (cur | prev) 11:02, 16 December 2020TR (talk | contribs). . (495 bytes) (-13). . (Created page with "Grundbegreppet Övertidssaldo räknar det totala övertidssaldot med hjälp av övertidssaldot i timmar och övertidssaldodatumet i medarbetarregistret.")
  • (cur | prev) 10:10, 16 December 2020TR (talk | contribs). . (508 bytes) (+2). . (Created page with "<b>Grundbegrepp Övertidssaldo i projektrapporter </b>")
  • (cur | prev) 10:09, 16 December 2020TR (talk | contribs). . (506 bytes) (+3). . (Created page with "{{News |Grundbegrepp Övertidssaldo i projektrapporter |module=Projekt |group=Rapporter |version=546W2048 |revision=0 |case=CORE-1360 |published=2020-12-15 }}")
  • (cur | prev) 10:07, 16 December 2020TR (talk | contribs). . (503 bytes) (+503). . (Created page with "Grundbegrepp Övertidssaldo i projektrapporter")