Revision history of "Translations:Resource planning/61/sv"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 09:54, 9 March 2026TR (talk | contribs). . (162 bytes) (+162). . (Created page with "== Allmänt och inställningar == I Projekt | Projekt, fliken Resursplanering kan medarbetarnas tid planeras. Tiden kan antingen planeras per dag eller per vecka.")