Difference between revisions of "Translations:Enter clients and projects/5/en"
From Marathon Documentation
Diana Nayis (talk | contribs) (Created page with "The system is constructed such that the majority of the client data is synchronised to the projects. The synchronised fields are marked with a green dot. It is possible to dea...") |
|||
Line 1: | Line 1: | ||
− | The system is constructed such that the majority of the client data is synchronised to the projects. The synchronised fields are marked with a green dot. It is possible to deactivate the synchronisation in the Client record, under the tab Parameters 2. Projects created |
+ | The system is constructed such that the majority of the client data is synchronised to the projects. The synchronised fields are marked with a green dot. It is possible to deactivate the synchronisation in the Client record, under the tab Parameters 2. Projects created after that will not be synchronised with the client. |
Revision as of 17:09, 22 January 2016
The system is constructed such that the majority of the client data is synchronised to the projects. The synchronised fields are marked with a green dot. It is possible to deactivate the synchronisation in the Client record, under the tab Parameters 2. Projects created after that will not be synchronised with the client.