Difference between revisions of "Translations:FAQ:PRO/Registration, corrections and updatings/10/en"
From Marathon Documentation
(Created page with "*Can I move non project related time (900-codes)to external projects? No, it can only be moved to not project related projects (9-projects). But if you at the time for moving...") |
(Importing a new version from external source) |
||
Line 1: | Line 1: | ||
+ | *Går det att flytta ej projektrelaterad tid (900-koder) till externa projekt? |
||
− | *Can I move non project related time (900-codes)to external projects? |
||
+ | Nej, ej projektrelaterad tid kan endast flyttas till projekt som är av typen Ej projektrelaterat (9-projekt). Om du däremot i samband med flytten även byter arvodeskod till extern kod så går det bra. |
||
− | No, it can only be moved to not project related projects (9-projects). But if you at the time for moving change the fee code to an external one, the moving is ok. |
Revision as of 14:48, 29 September 2016
- Går det att flytta ej projektrelaterad tid (900-koder) till externa projekt?
Nej, ej projektrelaterad tid kan endast flyttas till projekt som är av typen Ej projektrelaterat (9-projekt). Om du däremot i samband med flytten även byter arvodeskod till extern kod så går det bra.