Difference between revisions of "Translations:Resource planning/51/en"

From Marathon Documentation
Jump to: navigation, search
(Importing a new version from external source)
(Importing a new version from external source)
 
Line 1: Line 1:
If the parameter ”Show resource planned in project analysis” is checked (in Base register/Pro/Parameters/Clients and projects), two columns are shown in the project analysis view: Planned 1 and WIP 2.
+
If the parameter ”Show resource planned in project analysis” is checked (in System: Base register/Pro/Parameters/Clients and projects), two columns are shown in the project analysis view: Planned 1 and WIP 2.

Latest revision as of 15:51, 29 September 2016

If the parameter ”Show resource planned in project analysis” is checked (in System: Base register/Pro/Parameters/Clients and projects), two columns are shown in the project analysis view: Planned 1 and WIP 2.