Difference between revisions of "News:Added Document tab on the Supplier under Base registers - Project ledger - Suppliers/en"
From Marathon Documentation
Line 23: | Line 23: | ||
{{ExpandImage|Suppliers_document_directory.png}} |
{{ExpandImage|Suppliers_document_directory.png}} |
||
− | This makes it possible to have a directory within Marathon that |
+ | This makes it possible to have a directory within Marathon that retrieves and lists documents associated with the Supplier. |
Revision as of 10:05, 20 November 2018
Added Document tab on the Supplier under Base registers/PL/Suppliers
Published | 2018-11-16 |
---|---|
Module | System |
Version | 546 |
Revision | 44929 |
Case number | 1051149 |
Added Document tab on the Supplier under Base registers/PL/Suppliers
New fields under Base registers/Company specific parameters/Parameters: "Path documents P/L" and "Path documents P/L (Mac OS)".
If one, or both, of these fields contain a path to a local/remote directory, then the tab "Document" will appear on the Supplier under Base registers/PL/Suppliers.
When pressing the button "Create directory", a new folder will be created within the local/remote directory path defined under Base registers/Company specific parameters/Parameters.
The folder name will be the Supplier's ID code.
This makes it possible to have a directory within Marathon that retrieves and lists documents associated with the Supplier.