Difference between revisions of "News:Perform credit check when confirming estimate/da"

From Marathon Documentation
Jump to: navigation, search
(Created page with "Gør kreditkontrol ved bekræftelse af budget")
 
(Created page with "{{News |Gør kreditkontrol ved bekræftelse af budget |module=System |group=Basisregister |version=546 |revision=45687 |case=1062658 |published=2019-01-16 }}")
Line 1: Line 1:
 
{{News
 
{{News
  +
|Gør kreditkontrol ved bekræftelse af budget
|Perform credit check when confirming estimate
 
 
|module=System
 
|module=System
|group=Base registers
+
|group=Basisregister
 
|version=546
 
|version=546
 
|revision=45687
 
|revision=45687

Revision as of 09:26, 22 January 2019

Gør kreditkontrol ved bekræftelse af budget
Published 2019-01-16
Module System
Version 546
Revision 45687
Case number 1062658

Perform credit check when confirming estimate

Activated with the parameters under Base registers/Med/Parameters in tab General: "Include project estimate purchases" and "Include project estimate fees".

The amount on the estimate is added to the WIP PRO sum and if the credit limit is passed, the estimate can not be confirmed.

This also requires that the parameter "Include only confirmed estimates" is checked under Base registers/Pro/Parameters/Project estimate.