Difference between revisions of "Marathon Time"

From Marathon Documentation
Jump to: navigation, search
(Resource planning)
(Marked this version for translation)
 
(35 intermediate revisions by 2 users not shown)
Line 1: Line 1:
  +
__FORCETOC__
_FORCETOC__
 
 
<translate>
 
<translate>
   
== Marathon Time ==
+
== Time reporting == <!--T:1-->
   
  +
<!--T:2-->
Time reports are made in Marathon Time.
 
  +
Time reports are made in Projects: Time reporting.
   
  +
<!--T:3-->
 
{{ExpandImage|pro-tid-en--Bild1.png}}
 
{{ExpandImage|pro-tid-en--Bild1.png}}
   
  +
<!--T:5-->
== Time reporting ==
 
  +
The main view shows the month's calendar. All employees are connected to a calendar; different working hours have different calendars. The working hours that you are expected to report are shown in the bottom right corner. The days in the calendar have a few colour codes which show if the reporting is completed or not.
 
The main view shows the month’s calendar. All employees are connected to a calendar; different working hours have different calendars. The working hours that you are expected to report are shown in the bottom right corner. The days in the calendar have a few colour codes which show if the reporting is completed or not.
 
   
  +
<!--T:6-->
 
{| class=mandeflist
 
{| class=mandeflist
 
|'''Green'''
 
|'''Green'''
Line 22: Line 24:
 
|The day is marked as unfinished. A yellow day can not be updated to the accounting system.
 
|The day is marked as unfinished. A yellow day can not be updated to the accounting system.
 
|-
 
|-
|'''Black'''
+
|'''Black/white'''
 
|Future days
 
|Future days
 
|}
 
|}
   
  +
<!--T:7-->
A day that contents reported time is marked with a dot under tha date.
 
Keep the indicator over acertain day, and you can see the details of that day’s reporting on the right part of the screen.
+
A day that contents reported time is marked with a dot under tha date. Keep the indicator over a certain day, and you can see the details of that day’s reporting on the right part of the screen.
   
  +
<!--T:8-->
 
At the same time you can see in the bottom of the page how many hours that are reported that day,how many hours are reported so far that month and the total reported time that month.
 
At the same time you can see in the bottom of the page how many hours that are reported that day,how many hours are reported so far that month and the total reported time that month.
   
  +
<!--T:9-->
If your company uses overtime follow-up, your plus-/minus balance will show in the OT balance column (setting in Base registers/Pro/Employees)
 
  +
If your company uses overtime follow-up, your plus-/minus balance will show in the OT balance column (setting in System: Base registers/Pro/Employees)
   
  +
<!--T:10-->
Browse between months by clicking the arrows surrounding the month’s name. If the backwards arrow is yellow, there are incompletely reported days in one or more of the previous months.Click on a dayin order to open it. Additional to hours, you can also report material that you have been using and thatshall be charged on the project.
 
  +
Browse between months by clicking the arrows surrounding the month’s name. Double click on a day to open it or select day and click Open.
   
  +
<!--T:64-->
  +
You can activate Quick search in Marathon. Right-click when inside a day report and select Quick searh from the popup window.
  +
  +
<!--T:11-->
 
{{ExpandImage|pro-tid-en--Bild2.png}}
 
{{ExpandImage|pro-tid-en--Bild2.png}}
   
  +
<!--T:12-->
 
{| class=mandeflist
 
{| class=mandeflist
 
|'''Project'''
 
|'''Project'''
|Write the project ID or click the grey search box and pick up the project from there.
+
|Write the project ID or search from list and pick up the project from there.
|}
+
|_
 
{{ExpandImage|pro-tid-en--Bild3.png}}
 
 
{| class=mandeflist
 
 
|'''Only Mine'''
 
|'''Only Mine'''
 
|Tick in the box if you want to see projects where you are client manager, project manager, product manager or team member.
 
|Tick in the box if you want to see projects where you are client manager, project manager, product manager or team member.
Line 52: Line 58:
 
|-
 
|-
 
|'''Recent'''
 
|'''Recent'''
|The latest projects you have been using in Marathon Time. The amountof recent projects can be set in Settings under the cog wheel in the upper right corner of Marathon.
+
|The latest projects you have been using in Marathon Time. The amount of recent projects can be set in Settings under the cog wheel in the upper right corner of Marathon.
 
|-
 
|-
 
|'''Sort by Master'''
 
|'''Sort by Master'''
|Master projects are shown above the projects that are connected to it. {{ExpandImage|pro-tid-en-Bild4.png}}
+
|Master projects are shown above the projects that are connected to it.
 
|-
 
|-
 
|'''Quick search'''
 
|'''Quick search'''
 
|Quick search in Marathon Time can be activated by right clicking in the day report. A pop-up window is shown, where you can activate quick search.
 
|Quick search in Marathon Time can be activated by right clicking in the day report. A pop-up window is shown, where you can activate quick search.
 
|-
 
|-
|'''Kod'''
+
|'''Code'''
|Enter code or pick up from the search box.
+
|Enter code or pick up from the search list.
 
|-
 
|-
 
|'''Hours'''
 
|'''Hours'''
Line 67: Line 73:
 
|-
 
|-
 
|'''Comments'''
 
|'''Comments'''
|You can write an optional comment. You can use maximum 100 characters. The comment is visible in Client and Project and in some lists, but is not automatically showing up on the invoice.
+
|You can write an optional comment. You can use maximum 100 characters. The comment is visible in lists and reports, but is not automatically showing up on the invoice.
 
|-
 
|-
 
|'''Other'''
 
|'''Other'''
Line 79: Line 85:
 
|-
 
|-
 
|'''Not ready'''
 
|'''Not ready'''
|If you are not ready with the report you can tick the box Not Ready. Inthat way you can save incomplete lines temporarily. An unfinished day shows as yellow in the calendar, and it can not be updated into the accounting system.
+
|If you are not ready with the report you can tick the box Not Ready. In that way you can save incomplete lines temporarily. An unfinished day shows as yellow in the calendar, and it can not be updated into the accounting system.
 
|-
 
|-
 
|'''New line'''
 
|'''New line'''
Line 92: Line 98:
 
|'''Import from resource…'''
 
|'''Import from resource…'''
 
|Click to import project, comments and hours from the resource planning.
 
|Click to import project, comments and hours from the resource planning.
|-
 
|'''Spara mall'''
 
|En rapporterad dag kan sparas som en mall och fortsättningsvis användas vid rapportering
 
 
|-
 
|-
 
|'''Save template'''
 
|'''Save template'''
Line 109: Line 112:
 
|}
 
|}
   
  +
<!--T:15-->
When the rows in the day report have been updated to the accounting department, they are shaded grey and can no longer be changed.
 
However you can add rows into an updated report.
+
When the rows in the day report have been updated to the accounting department, they are shaded grey and can no longer be changed. However you can add rows into an updated report.
   
== Multiple days ==
+
== Multiple days == <!--T:16-->
   
  +
<!--T:17-->
 
If you want to make many similar reports, e.g. when reporting holidays or sick leaves, you can use Multiple days.
 
If you want to make many similar reports, e.g. when reporting holidays or sick leaves, you can use Multiple days.
   
  +
<!--T:18-->
{{ExpandImage|pro-tid-en--grafik4.png}}Click the days you want to report. The days in the calendar will turn a little bit darker. At the same time the days are presented on the right side of the screen (use arrows to change moth).
 
  +
{{ExpandImage|pro-tid-en--grafik4.png}}
   
  +
<!--T:63-->
  +
Click the days you want to report. The days in the calendar will turn a little bit darker. At the same time the days are presented on the right side of the screen (use arrows to change moth).
  +
  +
<!--T:19-->
 
Fill in project, code, hours and an optional comment.
 
Fill in project, code, hours and an optional comment.
   
  +
<!--T:20-->
 
Tick the box Fill if you want the system to fill up the remaining time with absence. Save or cancel.
 
Tick the box Fill if you want the system to fill up the remaining time with absence. Save or cancel.
   
== Reconciliation ==
+
== Reconciliation == <!--T:21-->
   
  +
<!--T:22-->
The reconciliation table shows how the time has been reported. The colour indications are the same as in the calendar: red days are incomplete, yellow not finished and green days ready. Future days are also green. You can reduce the list by selecting group or staff category.
 
  +
The reconciliation table shows how the time has been reported. The same list is available in Projects: Reports. The colour indications are the same as in the calendar: red days are incomplete, yellow not finished and green days ready. Future days are also green. You can reduce the list by selecting group or staff category.
   
  +
<!--T:23-->
 
{{ExpandImage|pro-tid-en--Bild5.png}}
 
{{ExpandImage|pro-tid-en--Bild5.png}}
   
== Project estimate ==
+
== Project estimate == <!--T:24-->
   
  +
<!--T:25-->
 
If the estimate of the project is made on Employee-level, the estimated hours are visible in this program.
 
If the estimate of the project is made on Employee-level, the estimated hours are visible in this program.
   
  +
<!--T:26-->
 
{{ExpandImage|pro-tid-en--Bild6.png}}
 
{{ExpandImage|pro-tid-en--Bild6.png}}
   
  +
<!--T:27-->
 
The project estimate shows all projects in which you have been estimated. Each combination of project and job code is shown as a separate line, together with a description (if written), number of hours estimated and registered. You can also see start- and end dates - if they have been entered.The table has also a box where you can tick off a line as ready. You can select to see only finished/active estimate lines.
 
The project estimate shows all projects in which you have been estimated. Each combination of project and job code is shown as a separate line, together with a description (if written), number of hours estimated and registered. You can also see start- and end dates - if they have been entered.The table has also a box where you can tick off a line as ready. You can select to see only finished/active estimate lines.
   
  +
<!--T:28-->
 
{| class=mandeflist
 
{| class=mandeflist
 
|'''Normal'''
 
|'''Normal'''
Line 144: Line 160:
 
|}
 
|}
   
== Employee estimate ==
+
== Employee estimate == <!--T:29-->
   
  +
<!--T:30-->
 
Employee estimate shows the estimate that the accounting department has been entering.
 
Employee estimate shows the estimate that the accounting department has been entering.
   
  +
<!--T:31-->
 
The list shows estimated hours, reported hours and the difference between them. Further you can see estimated amount, result amount, adjusted net and the difference.
 
The list shows estimated hours, reported hours and the difference between them. Further you can see estimated amount, result amount, adjusted net and the difference.
   
== Resource planning ==
+
== Resource planning == <!--T:32-->
   
  +
<!--T:33-->
Resource planning shows what has been planned for you for the week.
 
(Backoffice/Project accounting/Resource planning)
+
Resource planning shows what has been planned for you for the week. (Registered in Project: Resource planning)
   
  +
<!--T:34-->
 
{{ExpandImage|pro-tid-en--grafik5.png}}
 
{{ExpandImage|pro-tid-en--grafik5.png}}
   
  +
<!--T:35-->
 
Here you can compare your planned time with the actual time you have been reporting for each week.
 
Here you can compare your planned time with the actual time you have been reporting for each week.
   
  +
== Client/Project == <!--T:38-->
== Change employee ==
 
   
  +
<!--T:39-->
If you are authorized to it, you can change employee and check her/his time reports.
 
  +
Under the tabs Client and Project you van see time reports for one month, shown per project. To the left you can see the projectx, hours reported by code, total for each project and reported absence. At the bottom of the table you can see the complete month’s hours.
   
  +
<!--T:40-->
== Total project ==
 
  +
When you select a line, details are shown in the right side of the screen. You can also see the comments you may have written in the time report.
   
Total project shows time reports for one month, shown per project. The hours are first shown per code, and then summed per project.
 
Reported absence is also shown as a project. At the bottom of the table you can see the complete month’s hours.
 
   
  +
== Day list == <!--T:42-->
When you select a line, details are shown in the right side of the screen. You can also see the comments you may have written in the time report.
 
   
  +
<!--T:43-->
{{ExpandImage|pro-tid-en-grafik8.png}}
 
  +
In the day list you can follow your reported time per day for a selected month. For each day, you cansee which projects, codes and hours you have reported time on. Further you can see the monetary value of the accumulated time and the comment you may have written. After each day the total amount of hours is shown. At the bottom of the table you can see the total amount of hours and its monetary value for the complete month.
   
  +
<!--T:67-->
== Day list ==
 
  +
{{ExpandImage|pro-tid-en--grafik8.png}}
   
In the day list you can follow your reported time per day for a selected month. For each day, you cansee which projects, codes and hours you have reported time on. Further you can see the monetary value of the accumulated time and the comment you may have written.
 
After each day the total amount of hours is shown. At the bottom of the table you can see the total amount of hours and its monetary value for the complete month.
 
   
  +
== Week summary == <!--T:45-->
{{ExpandImage|pro-tid-en-grafik9.png}}
 
 
== Week summary ==
 
   
  +
<!--T:46-->
 
Week summary shows the time report for a selected week. Change week by clicking the arrowssurrounding the week number. The week summary shows the project, code and amount of hours reported on each project. The column on the far right shows the total amount of reported hours for each project during the selected week.
 
Week summary shows the time report for a selected week. Change week by clicking the arrowssurrounding the week number. The week summary shows the project, code and amount of hours reported on each project. The column on the far right shows the total amount of reported hours for each project during the selected week.
   
  +
==Change employee == <!--T:65-->
{{ExpandImage|pro-tid-en-grafik10.png}}
 
  +
You can open another employee's time report with thisi function, provided that you have the authorisation to do so.
 
 
== Functions ==
 
 
{| class=mandeflist
 
|'''Tab/Enter'''
 
|Move to next object/field
 
|-
 
|'''Shift+Tab'''
 
|Move to previous object/field
 
|-
 
|'''Alt+”Letter”'''
 
|Instead of clicking, you can activate a function with Alt+ the letter that is underlined in the word. E.g. OPEN with Alt + O.
 
|-
 
|'''Ctrl+Page Down'''
 
|Move to next tab, e.g. in the Client &amp; Project module
 
|-
 
|'''Ctrl+Page Up'''
 
|Move to previous tab
 
|-
 
|'''Search box'''
 
|A grey box with three dots shows the alternatives to fill the field with
 
|-
 
|'''F1'''
 
|Open search box
 
|-
 
|'''F3'''
 
|Copies last saved information in a field.
 
|-
 
|'''Quick search'''
 
|You can write the first characters of a code, name etc. The search list will only include those alternatives that fit your search.
 
|}
 
 
In the right bottom corner of the screen you can see in red if you have unreported days in Marathon
 
 
Time, invoices to approve or faxes/emails sent from Marathon that are in the sending queue. Click on
 
 
the names to move directly to respective program.
 
 
== Favourites in Marathon ==
 
 
The favourite function is available in most of the tables in Marathon and means that each user can select her/his own favourites. The selection is individual for your user name and has to be made in each list separately.
 
 
Open the column alternative box (grey box outmost to right in a list’s header row) and select colours to use in your list. Five different colours can be used in one list. Click on the colour dot to change colour.
 
 
{{ExpandImage|pro-tid-en-grafik11.png}}
 
 
Click in the favourite column at outmost left in all tables and select your favourites. Click several times to change colour.
 
 
{{ExpandImage|pro-tid-en-grafik12.png}}
 
 
Click on the header of the favourite column to change different colour displays.
 
 
{{ExpandImage|pro-tid-en-grafik17.png}}
 
   
Continue clicking to see only one favourite colour.
 
   
  +
<!--T:66-->
[[Category:pro-tid-en]]
 
  +
[[Category:pro-tid-en]] [[Category:Projects]] [[Category:Manuals]]
 
</translate>
 
</translate>

Latest revision as of 15:23, 29 April 2020


Time reporting

Time reports are made in Projects: Time reporting.

The main view shows the month's calendar. All employees are connected to a calendar; different working hours have different calendars. The working hours that you are expected to report are shown in the bottom right corner. The days in the calendar have a few colour codes which show if the reporting is completed or not.

Green Indicates that the day is completely reported. Days that don’t need reporting, e.g. holidays, are already green
Red Indicates that the day is not, or is incompletely reported.
Yellow The day is marked as unfinished. A yellow day can not be updated to the accounting system.
Black/white Future days

A day that contents reported time is marked with a dot under tha date. Keep the indicator over a certain day, and you can see the details of that day’s reporting on the right part of the screen.

At the same time you can see in the bottom of the page how many hours that are reported that day,how many hours are reported so far that month and the total reported time that month.

If your company uses overtime follow-up, your plus-/minus balance will show in the OT balance column (setting in System: Base registers/Pro/Employees)

Browse between months by clicking the arrows surrounding the month’s name. Double click on a day to open it or select day and click Open.

You can activate Quick search in Marathon. Right-click when inside a day report and select Quick searh from the popup window.

Project Write the project ID or search from list and pick up the project from there. _ Only Mine Tick in the box if you want to see projects where you are client manager, project manager, product manager or team member.
Group Projects belonging to selected group
Recent The latest projects you have been using in Marathon Time. The amount of recent projects can be set in Settings under the cog wheel in the upper right corner of Marathon.
Sort by Master Master projects are shown above the projects that are connected to it.
Quick search Quick search in Marathon Time can be activated by right clicking in the day report. A pop-up window is shown, where you can activate quick search.
Code Enter code or pick up from the search list.
Hours Write one hour as 1 and half hour as 0, 5. It is not recommended to use smaller amounts than a quarter, i.e. 0, 25
Comments You can write an optional comment. You can use maximum 100 characters. The comment is visible in lists and reports, but is not automatically showing up on the invoice.
Other Enter code or pick up from the search box.
Amount If you have filled in material in the Other-field, enter how many items you have been using.
Finished If your report is not corresponding with the expectation, i.e. you report fewer hours, you can tick the box Finished. The day will then show as green in the calendar.
Not ready If you are not ready with the report you can tick the box Not Ready. In that way you can save incomplete lines temporarily. An unfinished day shows as yellow in the calendar, and it can not be updated into the accounting system.
New line Inserts a new line above the selected line
Delete line Deletes the selected line.
Copy line When you copy a line the new line will come under the copied line and the other lines will move one step down.
Import from resource… Click to import project, comments and hours from the resource planning.
Save template You can save a frequently used time report and use it as a template. It is not recommended to save hours in the template.
Fill up with absence If your company is using an Absence -code, click this after an incomplete report and the system fills the remaining time with this code. It is otherwise recommended to click the Finished- box if the day is not ready.
Copy from You can copy a complete day report. Click on the arrow in the COPY FROM menu, and select a date. The last 10 days are shown in the list.
Save/Cancel Always leave the report with Save or Cancel

When the rows in the day report have been updated to the accounting department, they are shaded grey and can no longer be changed. However you can add rows into an updated report.

Multiple days

If you want to make many similar reports, e.g. when reporting holidays or sick leaves, you can use Multiple days.

Click the days you want to report. The days in the calendar will turn a little bit darker. At the same time the days are presented on the right side of the screen (use arrows to change moth).

Fill in project, code, hours and an optional comment.

Tick the box Fill if you want the system to fill up the remaining time with absence. Save or cancel.

Reconciliation

The reconciliation table shows how the time has been reported. The same list is available in Projects: Reports. The colour indications are the same as in the calendar: red days are incomplete, yellow not finished and green days ready. Future days are also green. You can reduce the list by selecting group or staff category.

Project estimate

If the estimate of the project is made on Employee-level, the estimated hours are visible in this program.

The project estimate shows all projects in which you have been estimated. Each combination of project and job code is shown as a separate line, together with a description (if written), number of hours estimated and registered. You can also see start- and end dates - if they have been entered.The table has also a box where you can tick off a line as ready. You can select to see only finished/active estimate lines.

Normal Start- and End dates
Relative Relative Start- and End dates, shown in relation to the start date. If you e.g. have a project that starts on April, 25th and today’s date is April, 15th, the number in the field will be “10”. This method shows more clearly which projects to prioritize.

Employee estimate

Employee estimate shows the estimate that the accounting department has been entering.

The list shows estimated hours, reported hours and the difference between them. Further you can see estimated amount, result amount, adjusted net and the difference.

Resource planning

Resource planning shows what has been planned for you for the week. (Registered in Project: Resource planning)

Here you can compare your planned time with the actual time you have been reporting for each week.

Client/Project

Under the tabs Client and Project you van see time reports for one month, shown per project. To the left you can see the projectx, hours reported by code, total for each project and reported absence. At the bottom of the table you can see the complete month’s hours.

When you select a line, details are shown in the right side of the screen. You can also see the comments you may have written in the time report.


Day list

In the day list you can follow your reported time per day for a selected month. For each day, you cansee which projects, codes and hours you have reported time on. Further you can see the monetary value of the accumulated time and the comment you may have written. After each day the total amount of hours is shown. At the bottom of the table you can see the total amount of hours and its monetary value for the complete month.


Week summary

Week summary shows the time report for a selected week. Change week by clicking the arrowssurrounding the week number. The week summary shows the project, code and amount of hours reported on each project. The column on the far right shows the total amount of reported hours for each project during the selected week.

Change employee

You can open another employee's time report with thisi function, provided that you have the authorisation to do so.