Difference between revisions of "Translations:FAQ:PRO/Queries-Client and project/6/en"

From Marathon Documentation
Jump to: navigation, search
(Created page with "*Can I block a project from time reporting? Yes, on the project in {{pth|Base registers/Pro/Client and project}}In the tab Parameters 2, uncheck the box {{kryss|Synchronize p...")
 
Line 1: Line 1:
 
*Can I block a project from time reporting?
 
*Can I block a project from time reporting?
Yes, on the project in {{pth|Base registers/Pro/Client and project}}In the tab Parameters 2, uncheck the box {{kryss|Synchronize project with client}}.Then uncheck teh box {{kryss|Time reporting}}.
+
Yes, on the project in {{pth|Base registers/Pro/Client and project}}In the tab Parameters 2, uncheck the box {{kryss|Synchronize project with client}}.Then uncheck the box {{kryss|Time reporting}}.

Revision as of 11:36, 26 October 2015

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (FAQ:PRO/Queries-Client and project)
*Can I block a project from time reporting?
Yes, on the project in Base registers/Pro/Client and projectIn the tab Parameters 2, uncheck the box "Synchronize project with client".Then uncheck the box "Time reporting".
Translation*Can I block a project from time reporting? 
Yes, on the project in {{pth|Base registers/Pro/Client and project}}In the tab Parameters 2, uncheck the box {{kryss|Synchronize project with client}}.Then uncheck the box {{kryss|Time reporting}}.
  • Can I block a project from time reporting?

Yes, on the project in Base registers/Pro/Client and projectIn the tab Parameters 2, uncheck the box "Synchronize project with client".Then uncheck the box "Time reporting".