Difference between revisions of "News:Cost centre in Age distributed WIP list"

From Marathon Documentation
Jump to: navigation, search
(Created page with "<translate> {{News |Cost centre in Age distributed WIP list |module=Projects |group=Reports |version=546W2212 |revision=0 |case=CORE-4208 |published=2023-01-18 }} <b>Cost cen...")
 
(Marked this version for translation)
 
Line 1: Line 1:
 
<translate>
 
<translate>
  +
<!--T:1-->
 
{{News
 
{{News
 
|Cost centre in Age distributed WIP list
 
|Cost centre in Age distributed WIP list
Line 10: Line 11:
 
}}
 
}}
   
  +
<!--T:2-->
 
<b>Cost centre in Age distributed WIP list</b>
 
<b>Cost centre in Age distributed WIP list</b>
   
  +
<!--T:3-->
 
A new column for Cost centre has been added to the Standard PRO report, Age distributed WIP list.
 
A new column for Cost centre has been added to the Standard PRO report, Age distributed WIP list.
   
  +
<!--T:4-->
 
The column is only shown in the report if the Printout is set to Spreadsheet and the checkbox Split per project is checked.
 
The column is only shown in the report if the Printout is set to Spreadsheet and the checkbox Split per project is checked.
   
  +
<!--T:5-->
 
To get the new column in a printed report, check the checkbox called Show cost centre (Spreadsheet).
 
To get the new column in a printed report, check the checkbox called Show cost centre (Spreadsheet).
   
  +
<!--T:6-->
 
{{ExpandImage|project_cost_centre_WIP_list_selection.png}}
 
{{ExpandImage|project_cost_centre_WIP_list_selection.png}}
   
   
  +
<!--T:7-->
 
The column is placed next to Project manager in the printed out report.
 
The column is placed next to Project manager in the printed out report.
   
   
  +
<!--T:8-->
 
{{ExpandImage|project_cost_centre_WIP_list_result.png}}
 
{{ExpandImage|project_cost_centre_WIP_list_result.png}}
   

Latest revision as of 10:59, 18 January 2023

Cost centre in Age distributed WIP list
Published 2023-01-18
Module Projects
Version 546W2212
Revision 0
Case number CORE-4208

Cost centre in Age distributed WIP list

A new column for Cost centre has been added to the Standard PRO report, Age distributed WIP list.

The column is only shown in the report if the Printout is set to Spreadsheet and the checkbox Split per project is checked.

To get the new column in a printed report, check the checkbox called Show cost centre (Spreadsheet).


The column is placed next to Project manager in the printed out report.