Difference between revisions of "News:Cost centre in Age distributed WIP list/fi"
From Marathon Documentation
(Created page with "{{News |Kustannuspaikka ikäjaetussa varastolistassa |module=Projektit |group=Raportit |version=546W2212 |revision=0 |case=CORE-4208 |published=2023-01-18 }}") |
(Created page with "<b>Kustannuspaikka ikäjaetussa varastolistassa</b>") |
||
Line 9: | Line 9: | ||
}} |
}} |
||
+ | <b>Kustannuspaikka ikäjaetussa varastolistassa</b> |
||
− | <b>Cost centre in Age distributed WIP list</b> |
||
A new column for Cost centre has been added to the Standard PRO report, Age distributed WIP list. |
A new column for Cost centre has been added to the Standard PRO report, Age distributed WIP list. |
Revision as of 12:16, 19 January 2023
Kustannuspaikka ikäjaetussa varastolistassa
Published | 2023-01-18 |
---|---|
Module | Projektit |
Version | 546W2212 |
Revision | 0 |
Case number | CORE-4208 |
Kustannuspaikka ikäjaetussa varastolistassa
A new column for Cost centre has been added to the Standard PRO report, Age distributed WIP list.
The column is only shown in the report if the Printout is set to Spreadsheet and the checkbox Split per project is checked.
To get the new column in a printed report, check the checkbox called Show cost centre (Spreadsheet).
The column is placed next to Project manager in the printed out report.