Difference between revisions of "News:Cost centre in Age distributed WIP list/fi"

From Marathon Documentation
Jump to: navigation, search
(Created page with "<b>Kustannuspaikka ikäjaetussa varastolistassa</b>")
(Created page with "Ikäjaettuun varastolistaan, joka on standardi PRO-raportti on lisätty sarake Kustannuspaikalle.")
Line 11: Line 11:
 
<b>Kustannuspaikka ikäjaetussa varastolistassa</b>
 
<b>Kustannuspaikka ikäjaetussa varastolistassa</b>
   
  +
Ikäjaettuun varastolistaan, joka on standardi PRO-raportti on lisätty sarake Kustannuspaikalle.
A new column for Cost centre has been added to the Standard PRO report, Age distributed WIP list.
 
   
 
The column is only shown in the report if the Printout is set to Spreadsheet and the checkbox Split per project is checked.
 
The column is only shown in the report if the Printout is set to Spreadsheet and the checkbox Split per project is checked.

Revision as of 12:19, 19 January 2023

Kustannuspaikka ikäjaetussa varastolistassa
Published 2023-01-18
Module Projektit
Version 546W2212
Revision 0
Case number CORE-4208

Kustannuspaikka ikäjaetussa varastolistassa

Ikäjaettuun varastolistaan, joka on standardi PRO-raportti on lisätty sarake Kustannuspaikalle.

The column is only shown in the report if the Printout is set to Spreadsheet and the checkbox Split per project is checked.

To get the new column in a printed report, check the checkbox called Show cost centre (Spreadsheet).


The column is placed next to Project manager in the printed out report.