Difference between revisions of "Resource planning/da"
(Created page with "Farvemarkering for jobtype kan vælges under Tandhjulet/Systemværdier, fanen Jobstyring.") |
|||
(81 intermediate revisions by 2 users not shown) | |||
Line 7: | Line 7: | ||
{{ExpandImage|PRO-RES-DA-Bild1.png}} |
{{ExpandImage|PRO-RES-DA-Bild1.png}} |
||
− | Farvemarkering for jobtype kan vælges under |
+ | Farvemarkering for jobtype kan vælges under {{pth|System|Basisregister/JOB/Parametrer}}, fanen {{flik|Honorar}}. |
+ | Medarbejdere, der skal være mulige at ressourceplanlægge, indstilles i {{pth|System|Basisregister/Job/ Medarbejdere}}. |
||
− | {{ExpandImage|PRO-RES-EN-Bild2.png}} |
||
+ | {{ExpandImage|PRO-RES-DA-Bild3.png}} |
||
− | Choose the employees that shall be selectable in the resource planning program in System: Base registers/Pro/Employees. |
||
+ | Du kan planlægge tiden for en gruppe, en personalekategori, eller et team. Du kan koble enkelte medarbejdere til gruppe, team og kategori i {{pth|System|Basisregister/Job/Medarbejdere}}. Planlægning kan også foretages på team på kunde og ekstra medarbejder kan lægges til i udvalget. |
||
− | {{ExpandImage|PRO-RES-EN-Bild3.png}} |
||
+ | {|class=mandeflist |
||
− | The planning can be made per group, staff category and working team. |
||
+ | !Gruppe |
||
− | These are connected with the employee in System: Base registers/PRO/Employee. |
||
+ | |Planlægning pr. Gruppe. Opret gruppe i {{pth|System|Basisregister/Job}} og kobl til medarbejderen i {{pth|System|Basisregister/Job/Medarbejdere}}. |
||
− | It is also possible to plan on client teams and to include additional employees to the selection. |
||
− | |||
− | {| class=mandeflist |
||
− | |'''Group''' |
||
− | |Planning per group. Register group in System: Base registers/Pro/Groups and connect to employee in Base registers/Pro/Employees. |
||
|- |
|- |
||
+ | !Personalekategori |
||
− | |'''Staff category''' |
||
+ | |Planlægning pr. Kategori. Opret kategori i {{pth|System|Basisregister/Job}} og kobl til medarbejderen i {{pth|System|Basisregister/Job/Medarbejdere}}. |
||
− | |Planning per staff category. Register in System: Base registers/Pro/Staff categories and connect to employee in Base registers/Pro/Employees. |
||
|- |
|- |
||
+ | !Team |
||
− | |'''Working team''' |
||
+ | |Planlægning pr. Team. Opret team i{{pth|System|Basisregister/Job}} og kobl til medarbejderen i {{pth|System|Basisregister/Job/Medarbejdere}}. |
||
− | |Planning per working team. Register in System: Base registers/Pro/Working teams and connect to employee in Base registers/Pro/Employees |
||
|- |
|- |
||
+ | !Team på kunde |
||
− | |'''Client team''' |
||
− | | |
+ | |Planlægning pr. Team. Teamet angives på kunden i {{pth|System|Basisregister/Job/Kunder/Job}}, fanen Team. |
|- |
|- |
||
+ | !Ekstra medarbejder |
||
− | |'''Additional employee''' |
||
+ | |Mulighed for at lægge til en ekstra medarbejdere til udvalget. |
||
− | |Possibility to add employees to the selection. |
||
|- |
|- |
||
+ | !Favoritter |
||
− | |'''Favourites''' |
||
+ | |Marker dine favoritter ved at klikke i kolonnen længst til venstre. Klik på kolonneoverskriften (som ikke har tekst) hvis du vil se alle koder og klik igen når du vil se kun favoritterne. |
||
− | |If you only want the list to show your favourites, click on the far left column. Shift between favourites and all by clicking on the column header. |
||
|} |
|} |
||
− | == |
+ | == Planlægning af ressourcer == |
+ | Ressourcer kan planlægges pr. dag eller pr. uge. Dobbeltklik eller vælg en af medarbejderens dage og klik Åbn. |
||
− | You can plan time per week or per day. Double click on an employee’s day or select the day in the chart and click Open. |
||
− | {{ExpandImage|PRO-RES- |
+ | {{ExpandImage|PRO-RES-DA-Bild4.png}} |
+ | Hvis tiden skal planlægges pr. uge, lægges al tid på mandagen. Vælg detaljeringsniveau Uge for at se en oversigt. |
||
− | If you are planning per week, enter all hours on Monday. When you select itemization level “Week”, you will have the overview of the week. |
||
+ | Indtast (eller hent) jobnummer, skriv en kommentar ind, indtast beregnet antal timer og jobkode. Du er ikke nødt til at udfylde alle felter før du kan gemme planlægningen. Klik på {{btn|Gem}}. |
||
− | Enter project -id, comment, estimated hours and job code. All fields are not mandatory. Click OK to save and CANCEL to cancel your planning. |
||
− | == |
+ | == Fordel ressourcer == |
+ | Vælg en eller flere medarbejdere og en eller flere dage og klik på {{btn|fordel}}. |
||
− | Select one or several employees. Select day or an interval of days for the allocation. Click ALLOCATE. |
||
+ | |||
+ | {{ExpandImage|PRO-RES-DA-Bild5.png}} |
||
− | {{ExpandImage|PRO-RES-EN-Bild5.png}} |
||
{| class=mandeflist |
{| class=mandeflist |
||
+ | !Hele timeantalet… |
||
− | |'''Whole amount…''' |
||
+ | |Antal timer, du har skrevet ind i feltet {{fld|Timer}}, vil komme på hver dag og hver medarbejder som du har valgt. |
||
− | |The amount of hours written in the ''hours''-field will be allocated to all selected days and all selected employees. |
||
|- |
|- |
||
+ | !Jævnt fordelt |
||
− | |'''Equally allocated''' |
||
+ | |Timerne fordeles jævnt mellem angivne dage og medarbejdere |
||
− | |The hours written in the ''hours''-field will be divided and equally allocated between the selected days and employees. |
||
|- |
|- |
||
+ | !Maksimalt indtil… |
||
− | |'''Maximally until all…''' |
||
+ | |Timerne fordeles i alfabetisk rækkefølge indtil alle timer er fordelte. |
||
− | |The hours written in the ''hours''-field will be allocated to the employees in alphabetical order. |
||
|- |
|- |
||
+ | !Maksimal fordeling % |
||
− | |'''Maximal allocation %''' |
||
+ | |Angiv procentandel af timerne for Jævnt fordelt og Maksimalt indtil alt er fordelt. |
||
− | |Percentage of hours regarding ''Equally allocated'' and ''Max allocated''. Useful e.g. when an employee shall work a part of a day with a project. |
||
|} |
|} |
||
− | == |
+ | == Redigering af planlagte dage == |
+ | Højreklik på en dag for at redigere planlagt tid (Ctrl + museklik på Mac). Det er mulig at markere flere dage for redigering på én gang. |
||
− | Right click on a planned day (Ctrl + mouse click on Macs). You can also select several days to edit at the same time. |
||
− | {{ExpandImage|PRO-RES- |
+ | {{ExpandImage|PRO-RES-DA-Bild6.png}} |
{| class=mandeflist |
{| class=mandeflist |
||
+ | !Kopier |
||
− | |'''Copy''' |
||
+ | |En dag kan kopieres til anden dag eller anden medarbejder. |
||
− | |It is possible to copy a planned day or employee. |
||
|- |
|- |
||
+ | !Flyt |
||
− | |'''Move''' |
||
+ | |Den markerede dag kan flyttes/klippes ud til en anden dag eller en anden medarbejder. |
||
− | |The selected day can be moved/pasted into another date or employee. |
||
|- |
|- |
||
+ | !Sæt ind |
||
− | |'''Paste''' |
||
+ | |Vælg dag, du vil kopiere til. Det erstatter tidligere information. Du får en forespørgsel om det før indsætning. |
||
− | |Paste the copied day to another day or another employee. It replaces earlier information. Before pasting, you will have a question if you want to replace existing information. |
||
|- |
|- |
||
+ | !Læg til |
||
− | |'''Add''' |
||
+ | |En kopieret eller flyttet dag kan sættes ind i den markerede dag. |
||
− | |A copied or moved day can be pasted into the selected day without replacing existing information. The new information will be added to the existing. |
||
|- |
|- |
||
+ | !Slet |
||
− | |'''Delete''' |
||
− | | |
+ | |Al information i den markerede dag slettes. |
|} |
|} |
||
− | == |
+ | == Øvrige funktioner == |
{| class=mandeflist |
{| class=mandeflist |
||
+ | !Piler |
||
− | |'''Arrows''' |
||
+ | |Bladre mellem uger med pilene |
||
− | |Move between weeks with the arrows'''.''' |
||
|- |
|- |
||
+ | !Kopier periode |
||
− | |'''Copy period''' |
||
+ | |Med denne funktion kan du kopiere én eller flere medarbejdere og periode til en anden periode. |
||
− | |This function enables copying of selected employee(s) and period to another period. |
||
|} |
|} |
||
− | {{ExpandImage|PRO-RES- |
+ | {{ExpandImage|PRO-RES-DA-Bild7.png}} |
− | {| |
+ | {|class=mandeflist |
+ | !Eksport |
||
− | |'''Export''' |
||
+ | |Klik {{btn|Eksport}} hvis du vil skrive ressourceplanlægningen ud. Vælg derefter periode og OK. Du ser en selektion på skærmen. Under medarbejderen ser du den planlagte tid, og timer ifølge kalenderen. Hvis der finder flere planlagte timer end medarbejderens ordinære timer, vil summen vises med rødt. |
||
− | |Click EXPORT if you want to print out the planning to Excel. The printout shows the actual view of the screen. The planned time and hours from the calendar is written under each employee. If the planned hours exceeds the calendar hours, the amount is written in red. |
||
|} |
|} |
||
− | {{ExpandImage|PRO-RES- |
+ | {{ExpandImage|PRO-RES-DA-Bild8.png}} |
− | {| |
+ | {|class=mandeflist |
+ | !Fortryd |
||
− | |- |
||
+ | |Angrer den seneste indtastning. |
||
− | |'''Undo''' |
||
− | |This function undoes your last input. |
||
|} |
|} |
||
− | == |
+ | == Udvalg -vis == |
{| class=mandeflist |
{| class=mandeflist |
||
+ | !Planlagt |
||
− | |'''Planned time''' |
||
+ | |Viser tiden, der er blevet planlagt i ressourceplanlægningen. |
||
− | |If selected, the list shows the planned time from the resource planning. |
||
|- |
|- |
||
+ | !Brugt |
||
− | |'''Used time''' |
||
+ | |Viser tiden, der er rapporteret i Marathon Tid. |
||
− | |If selected, the list shows the reported time from Time reporting. |
||
|- |
|- |
||
+ | !Tomme rader |
||
− | |'''Empty rows''' |
||
+ | |Viser også de medarbejdere, der ikke har timer planlagte. |
||
− | |If you want to see all rows, even those without planned time, tick Empty rows. |
||
|- |
|- |
||
+ | !Summer |
||
− | |'''Sums''' |
||
+ | |Summerer en dags planlagte timer. |
||
− | |Summarises the day’s planned time. |
||
|- |
|- |
||
+ | !Sorter ikke |
||
− | |'''Do not sort''' |
||
+ | |Afkryds, hvis du ikke vil at programmet sorterer jobbene i alfabetisk rækkefølge. |
||
− | |Select/deselect for sorting in alphabetical order. |
||
|} |
|} |
||
− | == |
+ | == Udvalg – Detaljer == |
− | {| |
+ | {|class=mandeflist |
+ | !Detaljeret |
||
− | |'''Details''' |
||
+ | |Viser detaljeret ugevis ressourceplanlægning per dag og per medarbejder. |
||
− | |This selection shows a weekly resource planning per day and employee. |
||
|- |
|- |
||
+ | !Uge |
||
− | |'''Week''' |
||
+ | |Den planlagte tiden pr. uge |
||
− | |Shows the planned time per week |
||
|- |
|- |
||
+ | !Ledige ressourcer |
||
− | |'''Available resources''' |
||
+ | |Vælg farveindstillinger i Marathonvinduets øvre list under {{pth|Tandhjulet/Systemværdier/Jobstyring}}. Eksempelvis kan rød farve indikere, at ressourcen er helt planlagt og grøn, hvis der findes mulighed at planlægge mere meden hvid betyder, at der ikke findes noget planlagt. Feltet i Sum - kolonnen er gul, hvis der kun findes lidt tid igen for planlæggelse. |
||
− | |Colour settings can be made in FUNCTIONS the upper left corner; select SETTINGS and then Project accounting. Select rates of utilization for the different colours. In the example below, red colour indicates that the person is fully booked; green indicates that there is some time left and white that there is no planned time at all. If there is only a little time left for planning, the TOTAL- column will be yellow. |
||
|} |
|} |
||
− | {{ExpandImage|PRO-RES- |
+ | {{ExpandImage|PRO-RES-DA-Bild9.png}} |
− | == |
+ | == Liste == |
− | If you select ''List'' instead of overview, the program shows a list per project; what is planned and what has been registered. You can select type of project: You can deepen on date, employee, code, project or details. You can also deepen on a certain record, just click on a row to see details. |
||
+ | Hvis du vælger Liste, vil programmet vise den planlagte og den brugte tid. Fordybelse kan vælges på job, medarbejder, dato eller detaljer. Det er også mulig at fordybe sig på enkelte poster ved at dobbeltklikke på dem. |
||
− | {{ExpandImage|PRO-RES-EN-Bild10.png}} |
||
+ | |||
+ | {{ExpandImage|PRO-RES-DA-Bild10.png}} |
||
{| class=mandeflist |
{| class=mandeflist |
||
+ | !Slet |
||
− | |'''Delete''' |
||
+ | |Når du vælger Liste og fordybning på Detaljer, aktiveres Slet - knappen. Rader en eller flere rader ved at klikke på en rad (Ctrl + klikke på flere rader) og derefter SLET. |
||
− | |On itemisation level “List”, deepening on “Details”, the Delete-button is activated. Select one or several rows (press Ctrl-key and select rows) and click on DELETE. |
||
|- |
|- |
||
+ | !Job |
||
− | |'''Project''' |
||
+ | |Udvalget ''Alle'' viser alle jobs, ''Eksterne'' viser jobtyperne E, G, J (Eksterne, Koncernfæller og Spekulation), ''Ikke spek'' viser alle uden spekulationsjob. ''I følge liste'' viser en liste, der du kan vælge jobs. |
||
− | |Selection “All” shows all projects. “External” projects are E, G and J (external, group and speculations). “No spec” shows all except speculations. “According to list” opens a project list where you can select projects. |
||
|} |
|} |
||
− | == |
+ | == Flyt == |
− | |||
− | The function is used for moving hours on project – or employee level to other days. Select periods in the date fields (from –to). |
||
− | The period determines the first moving date and also limits amount of hours that can be moved. |
||
+ | Funktionen anvendes for at flytte planlagte timer på job- eller medarbejderniveau.Vælg periode i felterne for dato (fra – til). Datobegrænsningen afgør den første flyttedato og hvad der er muligt at flytte. |
||
− | Select deepening Project or Employee. Then, select project or person and click on Move. You will see a list of planned time for the project/person you’ve chosen. |
||
+ | Vælg fordybelse Job eller Medarbejder, vælg job eller person og klik i feltet Flyt. Du ser en liste med den planlagte tid for det job/den person, du har valgt. |
||
− | State how many working days the hours will be moved ahead. You can also write a date in the field To (start date). The columns New date and Left after moving are updated after each moving. |
||
+ | Angiv, hvor mange arbejdsdage fremad, du vil flytte timerne. Du kan ellers skrive en dato ind i feltet Til (startdato). Kolonnerne Ny dato og Tilbage efter flyt opdateres efter hvert flyt. |
||
− | New date shows the day of the planned move. |
||
+ | Ny dato viser, hvilken dag timerne flyttes, for så vidt flyttet foretages. |
||
− | Left after moving shows the day after the move has been done. |
||
+ | Tilbage efter flyt viser, hvordan dagen ser ud efter flyttet. |
||
− | Confirm by saving. Note, that a move cannot be undone. |
||
+ | Bekræft ved at gemme. Notér, at flyttet ikke kan fortrydes. |
||
− | == Time reporting == |
||
+ | == Timeføring == |
||
− | You can import project, comments and hours from the resource planning into the day report. Click the button IMPORT FROM RESOURCE PLANNING. |
||
+ | I dagrapporten kan en medarbejder hente job, kommentar og timer fra ressourceplanlægningen. Klik på {{btn|Hent fra ressourceplanlægningen}} og rediger rader bagefter, hvis du ønsker. |
||
− | {{ExpandImage|PRO-RES-EN-Bild11.png}} |
||
+ | {{ExpandImage|PRO-RES-DA-Bild11.png}} |
||
− | Click on RESOURCE PLANNING to see a weekly overview of your planned time. |
||
− | If you click the box REPORTED, you can compare your planned and used time. |
||
+ | Klik på {{btn|Ressourceplanlægning}} hvis du vil se din ugentlige planlægning. Du kan sammenligne timerne med din rapporterede tid. |
||
− | {{ExpandImage|PRO-RES-EN-Bild12.png}} |
||
+ | {{ExpandImage|PRO-RES-DA-Bild12.png}} |
||
− | == Project: Queries == |
||
+ | == Job: Forespørgsel == |
||
− | If the parameter ”Show resource planned in project analysis” is checked (in System: Base register/Pro/Parameters/Clients and projects), two columns are shown in the project analysis view: Planned 1 and WIP 2. |
||
+ | Hvis parameteren {{kryss|Vis ressourceplanlagt}} i jobanalyse er afkrydset ({{pth|Basisregister/Job/Parametre/Kunder og job}}), vises to nye kolonner i analysisbilledet for jobbet: planlagt samt Lager 2. |
||
− | Planned shows sales price fees for all future time that has been planned on the project and WIP 2 shows WIP+ Planned. |
||
+ | Planlagt viser salgspris Honorar for al tid, der er blevet planlagt på jobbet fremad i tiden og Lager 2 viser Lager + Planlagt |
||
− | {{ExpandImage|PRO-RES-EN-grafik16.png}} |
||
+ | {{ExpandImage|PRO-RES-DA-grafik16.png}} |
||
− | A project’s resource planning is shown in Project: Questions/Project, under the tab FEES. The list shows the planned time and the time so far reported on the project. You can select a time interval and sort the list per employee, code, date or details. You can also use quick search. |
||
+ | I fanebladet honorar, vises ressourceplanlægningen for det job, du er inde i. Her kan du se både planlagt og brugt tid. Du kan vælge tidsinterval og sortere pr. kode, medarbejder og dato. |
||
− | {{ExpandImage|PRO-RES-EN-grafik8.png}} |
||
+ | Du kan også vælge listen specificeret i detaljer. Der findes også et felt for hurtigsøg. |
||
+ | {{ExpandImage|PRO-RES-DA-grafik8.png}} |
||
− | == Reports == |
||
+ | == Rapporter == |
||
− | You can activate the data definition “Resource planned time” in Reports and use it as a column in your reports. |
||
+ | I modulen rapporter i Frontoffice er der mulighed at vælge Ressourceplanlagt tid som en kolonne i rapporter. |
||
− | {{ExpandImage|PRO-RES-EN-grafik15.jpg}} |
||
− | [[Category:PRO-RES- |
+ | [[Category:PRO-RES-DA]] [[Category:Manuals]] [[Category:ProjectS]] |
Latest revision as of 16:00, 17 December 2018
Contents
Generelt
Ressourceplanlægningen finder du i Jobs: Ressourceplanlægning. I ressourceplanlægningen kan du planlægge medarbejdernes timer pr. dag og uge.
Farvemarkering for jobtype kan vælges under System: Basisregister/JOB/Parametrer, fanen Honorar.
Medarbejdere, der skal være mulige at ressourceplanlægge, indstilles i System: Basisregister/Job/ Medarbejdere.
Du kan planlægge tiden for en gruppe, en personalekategori, eller et team. Du kan koble enkelte medarbejdere til gruppe, team og kategori i System: Basisregister/Job/Medarbejdere. Planlægning kan også foretages på team på kunde og ekstra medarbejder kan lægges til i udvalget.
Gruppe | Planlægning pr. Gruppe. Opret gruppe i System: Basisregister/Job og kobl til medarbejderen i System: Basisregister/Job/Medarbejdere. |
---|---|
Personalekategori | Planlægning pr. Kategori. Opret kategori i System: Basisregister/Job og kobl til medarbejderen i System: Basisregister/Job/Medarbejdere. |
Team | Planlægning pr. Team. Opret team iSystem: Basisregister/Job og kobl til medarbejderen i System: Basisregister/Job/Medarbejdere. |
Team på kunde | Planlægning pr. Team. Teamet angives på kunden i System: Basisregister/Job/Kunder/Job, fanen Team. |
Ekstra medarbejder | Mulighed for at lægge til en ekstra medarbejdere til udvalget. |
Favoritter | Marker dine favoritter ved at klikke i kolonnen længst til venstre. Klik på kolonneoverskriften (som ikke har tekst) hvis du vil se alle koder og klik igen når du vil se kun favoritterne. |
Planlægning af ressourcer
Ressourcer kan planlægges pr. dag eller pr. uge. Dobbeltklik eller vælg en af medarbejderens dage og klik Åbn.
Hvis tiden skal planlægges pr. uge, lægges al tid på mandagen. Vælg detaljeringsniveau Uge for at se en oversigt.
Indtast (eller hent) jobnummer, skriv en kommentar ind, indtast beregnet antal timer og jobkode. Du er ikke nødt til at udfylde alle felter før du kan gemme planlægningen. Klik på Gem.
Fordel ressourcer
Vælg en eller flere medarbejdere og en eller flere dage og klik på fordel.
Hele timeantalet… | Antal timer, du har skrevet ind i feltet Timer, vil komme på hver dag og hver medarbejder som du har valgt. |
---|---|
Jævnt fordelt | Timerne fordeles jævnt mellem angivne dage og medarbejdere |
Maksimalt indtil… | Timerne fordeles i alfabetisk rækkefølge indtil alle timer er fordelte. |
Maksimal fordeling % | Angiv procentandel af timerne for Jævnt fordelt og Maksimalt indtil alt er fordelt. |
Redigering af planlagte dage
Højreklik på en dag for at redigere planlagt tid (Ctrl + museklik på Mac). Det er mulig at markere flere dage for redigering på én gang.
Kopier | En dag kan kopieres til anden dag eller anden medarbejder. |
---|---|
Flyt | Den markerede dag kan flyttes/klippes ud til en anden dag eller en anden medarbejder. |
Sæt ind | Vælg dag, du vil kopiere til. Det erstatter tidligere information. Du får en forespørgsel om det før indsætning. |
Læg til | En kopieret eller flyttet dag kan sættes ind i den markerede dag. |
Slet | Al information i den markerede dag slettes. |
Øvrige funktioner
Piler | Bladre mellem uger med pilene |
---|---|
Kopier periode | Med denne funktion kan du kopiere én eller flere medarbejdere og periode til en anden periode. |
Eksport | Klik Eksport hvis du vil skrive ressourceplanlægningen ud. Vælg derefter periode og OK. Du ser en selektion på skærmen. Under medarbejderen ser du den planlagte tid, og timer ifølge kalenderen. Hvis der finder flere planlagte timer end medarbejderens ordinære timer, vil summen vises med rødt. |
---|
Fortryd | Angrer den seneste indtastning. |
---|
Udvalg -vis
Planlagt | Viser tiden, der er blevet planlagt i ressourceplanlægningen. |
---|---|
Brugt | Viser tiden, der er rapporteret i Marathon Tid. |
Tomme rader | Viser også de medarbejdere, der ikke har timer planlagte. |
Summer | Summerer en dags planlagte timer. |
Sorter ikke | Afkryds, hvis du ikke vil at programmet sorterer jobbene i alfabetisk rækkefølge. |
Udvalg – Detaljer
Detaljeret | Viser detaljeret ugevis ressourceplanlægning per dag og per medarbejder. |
---|---|
Uge | Den planlagte tiden pr. uge |
Ledige ressourcer | Vælg farveindstillinger i Marathonvinduets øvre list under Tandhjulet/Systemværdier/Jobstyring. Eksempelvis kan rød farve indikere, at ressourcen er helt planlagt og grøn, hvis der findes mulighed at planlægge mere meden hvid betyder, at der ikke findes noget planlagt. Feltet i Sum - kolonnen er gul, hvis der kun findes lidt tid igen for planlæggelse. |
Liste
Hvis du vælger Liste, vil programmet vise den planlagte og den brugte tid. Fordybelse kan vælges på job, medarbejder, dato eller detaljer. Det er også mulig at fordybe sig på enkelte poster ved at dobbeltklikke på dem.
Slet | Når du vælger Liste og fordybning på Detaljer, aktiveres Slet - knappen. Rader en eller flere rader ved at klikke på en rad (Ctrl + klikke på flere rader) og derefter SLET. |
---|---|
Job | Udvalget Alle viser alle jobs, Eksterne viser jobtyperne E, G, J (Eksterne, Koncernfæller og Spekulation), Ikke spek viser alle uden spekulationsjob. I følge liste viser en liste, der du kan vælge jobs. |
Flyt
Funktionen anvendes for at flytte planlagte timer på job- eller medarbejderniveau.Vælg periode i felterne for dato (fra – til). Datobegrænsningen afgør den første flyttedato og hvad der er muligt at flytte.
Vælg fordybelse Job eller Medarbejder, vælg job eller person og klik i feltet Flyt. Du ser en liste med den planlagte tid for det job/den person, du har valgt.
Angiv, hvor mange arbejdsdage fremad, du vil flytte timerne. Du kan ellers skrive en dato ind i feltet Til (startdato). Kolonnerne Ny dato og Tilbage efter flyt opdateres efter hvert flyt.
Ny dato viser, hvilken dag timerne flyttes, for så vidt flyttet foretages.
Tilbage efter flyt viser, hvordan dagen ser ud efter flyttet.
Bekræft ved at gemme. Notér, at flyttet ikke kan fortrydes.
Timeføring
I dagrapporten kan en medarbejder hente job, kommentar og timer fra ressourceplanlægningen. Klik på Hent fra ressourceplanlægningen og rediger rader bagefter, hvis du ønsker.
Klik på Ressourceplanlægning hvis du vil se din ugentlige planlægning. Du kan sammenligne timerne med din rapporterede tid.
Job: Forespørgsel
Hvis parameteren "Vis ressourceplanlagt" i jobanalyse er afkrydset (Basisregister/Job/Parametre/Kunder og job), vises to nye kolonner i analysisbilledet for jobbet: planlagt samt Lager 2.
Planlagt viser salgspris Honorar for al tid, der er blevet planlagt på jobbet fremad i tiden og Lager 2 viser Lager + Planlagt
I fanebladet honorar, vises ressourceplanlægningen for det job, du er inde i. Her kan du se både planlagt og brugt tid. Du kan vælge tidsinterval og sortere pr. kode, medarbejder og dato. Du kan også vælge listen specificeret i detaljer. Der findes også et felt for hurtigsøg.
Rapporter
I modulen rapporter i Frontoffice er der mulighed at vælge Ressourceplanlagt tid som en kolonne i rapporter.