Difference between revisions of "Translations:Resource planning/51/en"
From Marathon Documentation
(Created page with "If the parameter ”Show resource planned in project analysis” is checked (in System: Base register/Pro/Parameters/Clients and projects), two columns are shown in the projec...") |
|||
Line 1: | Line 1: | ||
− | If the parameter |
+ | If the parameter {{kryss|Show resource planned in project analysis}} is checked (in {{pth|System|Base register/Pro/Parameters/Clients and projects}}), two columns are shown in the project analysis view: Planned 1 and WIP 2. |
Revision as of 13:03, 25 January 2016
If the parameter "Show resource planned in project analysis" is checked (in System: Base register/Pro/Parameters/Clients and projects), two columns are shown in the project analysis view: Planned 1 and WIP 2.