Difference between revisions of "Translations:Resource planning/51/en"
From Marathon Documentation
(Importing a new version from external source) |
|||
| Line 1: | Line 1: | ||
| − | If the parameter |
+ | If the parameter ”Show resource planned in project analysis” is checked (in Base register/Pro/Parameters/Clients and projects), two columns are shown in the project analysis view: Planned 1 and WIP 2. |
Revision as of 15:44, 29 September 2016
If the parameter ”Show resource planned in project analysis” is checked (in Base register/Pro/Parameters/Clients and projects), two columns are shown in the project analysis view: Planned 1 and WIP 2.