Marathon Time
Marathon
Time
Time reports are made in Marathon Time.
Time reporting
The main view shows the month’s calendar. All employees are connected to a calendar; different working hours have different calendars. The working hours that you are expected to report are shown in the bottom right corner. The days in the calendar have a few colour codes which show if the reporting is completed or not.
Green Indicates
that the day is completely reported. Days that don’t need
reporting, e.g. holidays, are already green
Red Indicates
that the day is not, or is incompletely reported.
Yellow The
day is marked as unfinished. A yellow day can not be updated to the
accounting system.
Black Future
days
A
day that contents reported time is marked with a dot under tha date.
Keep the indicator over acertain day, and you can see the details of
that day’s reporting on the right part of the screen.
At the same time you can see in the bottom of the page how many hours that are reported that day,how many hours are reported so far that month and the total reported time that month.
If
your company uses overtime follow-up, your plus-/minus balance will
show in the OT balance column (setting in Base
registers/Pro/Employees)
Browse between months by clicking the arrows surrounding the month’s name. If the backwards arrow is yellow, there are incompletely reported days in one or more of the previous months.Click on a dayin order to open it. Additional to hours, you can also report material that you have been using and thatshall be charged on the project.
Project Write the project ID or click the grey search box and pick up the project from there.
Only
Mine Tick in the box if you want to see projects where you are
client manager, project manager, product manager or team member.
Group
Projects belonging to selected group
Recent
The latest projects you have been using in Marathon Time. The
amountof recent projects can be set in Settings under the cog wheel
in the upper right corner of Marathon.
Sort
by Master Master projects are
shown above the projects that are connected to it.
Quick
search Quick search in Marathon Time can be activated by right
clicking in the day report. A pop-up window is shown, where you can
activate quick search.
Kod Enter
code or pick up from the search box.
Hours Write
one hour as 1 and half hour as 0, 5. It is not recommended to use
smaller amounts than a quarter, i.e. 0, 25
Comments You
can write an optional comment. You can use maximum 100 characters.
The comment is visible in Client and Project and in some lists, but
is not automatically showing up on the invoice.
Other
Enter code or pick up from the search box.
Amount
If you have filled in material in the Other-field, enter how many
items you have been using.
Finished
If your report is not corresponding with the expectation, i.e.
you report fewer hours, you can tick the box Finished. The day will
then show as green in the calendar.
Not
ready If
you are not ready with the report you can tick the box Not Ready.
Inthat way you can save incomplete lines temporarily. An
unfinished day shows as yellow in the calendar, and it can not be
updated into the accounting system.
New
line Inserts
a new line above the selected line
Delete
line Deletes
the selected line.
Copy
line When
you copy a line the new line will come under the copied line and
the other lines will move one step down.
Import
from resource…
Click to import project, comments and hours from the resource
planning.
Spara
mall En
rapporterad dag kan sparas som en mall och fortsättningsvis
användas vid rapportering
Save
template You can save a frequently used time report and use it
as a template. It is not recommended to save hours in the template.
Fill
up with absence If
your company is using an Absence -code, click this after an
incomplete report and the system fills the remaining time with this
code. It is otherwise recommended to click the Finished- box if the
day is not ready.
Copy
from You can copy a complete day report. Click on the arrow in
the COPY FROM menu, and select a date. The last 10 days are shown in
the list.
Save/Cancel Always leave the report with Save or Cancel
When
the rows in the day report have been updated to the accounting
department, they are shaded grey and can no longer be changed.
However you can add rows into an updated report.
Multiple
days
If you want to make many similar reports, e.g. when reporting holidays or sick leaves, you can use Multiple days.
Click the days you want to report. The days in the calendar will turn a little bit darker. At the same time the days are presented on the right side of the screen (use arrows to change moth).
Fill in project, code, hours and an optional comment.
Tick the box Fill if you want the system to fill up the remaining time with absence. Save or cancel.
Reconciliation
The reconciliation table shows how the time has been reported. The colour indications are the same as in the calendar: red days are incomplete, yellow not finished and green days ready. Future days are also green. You can reduce the list by selecting group or staff category.
Project
estimate
If the estimate of the project is made on Employee-level, the estimated hours are visible in this program.
The project estimate shows all projects in which you have been estimated. Each combination of project and job code is shown as a separate line, together with a description (if written), number of hours estimated and registered. You can also see start- and end dates - if they have been entered.The table has also a box where you can tick off a line as ready. You can select to see only finished/active estimate lines.
Normal Start- and End dates
Relative Relative
Start- and End dates, shown in relation to the start date. If you
e.g. have a project that starts on April, 25th and today’s
date is April, 15th, the number in the field will be “10”.
This method shows more clearly which projects to prioritize.
Employee estimate
Employee estimate shows the estimate that the accounting department has been entering.
The list shows estimated hours, reported hours and the difference between them. Further you can see estimated amount, result amount, adjusted net and the difference.
Resource planning
Resource planning shows what has been planned for you for the week. (Backoffice/Project accounting/Resource planning)
Here you can compare your planned time with the actual time you have been reporting for each week.
Change employee
If you are authorized to it, you can change employee and check her/his time reports.
Total
project
Total project shows time reports for one month, shown per project. The hours are first shown per code, and then summed per project. Reported absence is also shown as a project. At the bottom of the table you can see the complete month’s hours.
When you select a line, details are shown in the right side of the screen. You can also see the comments you may have written in the time report.
Day list
In
the day list you can follow your reported time per day for a
selected month. For each day, you cansee which projects, codes and
hours you have reported time on. Further you can see the monetary
value of the accumulated time and the comment you may have written.
After each day the total amount of hours is shown. At the bottom of
the table you can see the total amount of hours and its monetary
value for the complete month.
Week
summary
Week summary shows the time report for a selected week. Change week by clicking the arrowssurrounding the week number. The week summary shows the project, code and amount of hours reported on each project. The column on the far right shows the total amount of reported hours for each project during the selected week.
Functions
Tab/Enter
Move to next
object/field
Shift+Tab
Move to previous object/field
Alt+”Letter”
Instead of clicking, you can activate a function with Alt+ the
letter that is underlined in the word. E.g. OPEN with Alt + O.
Ctrl+Page
Down Move to next tab, e.g. in the Client & Project module
Ctrl+Page
Up Move to previous tab
Search
box A grey box with three dots shows the alternatives to fill
the field with
F1
Open search box
F3
Copies last saved information in a field.
Quick
search You can write the first characters of a code, name etc.
The search list will only include those alternatives that fit your
search.
In the right bottom corner of the screen you can see in red if you have unreported days in Marathon
Time, invoices to approve or faxes/emails sent from Marathon that are in the sending queue. Click on
the names to move directly to respective program.
Favourites in Marathon
The
favourite function is available in most of the tables in Marathon
and means that each user can select her/his own favourites. The
selection is individual for your user name and has to be made in
each list separately.
Open
the column alternative box (grey box outmost to right in a list’s
header row) and select colours to use in your list. Five different
colours can be used in one list. Click on the colour dot to change
colour.
Click
in the favourite column at outmost left in all tables and select
your favourites. Click several times to change colour.
Click
on the header of the favourite column to change different colour
displays.
Continue
clicking to see only one favourite colour.