Translations:FAQ:PRO/Queries-Client and project/6/en

From Marathon Documentation
Revision as of 12:36, 26 October 2015 by TR (talk | contribs) (Created page with "*Can I block a project from time reporting? Yes, on the project in {{pth|Base registers/Pro/Client and project}}In the tab Parameters 2, uncheck the box {{kryss|Synchronize p...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Can I block a project from time reporting?

Yes, on the project in Base registers/Pro/Client and projectIn the tab Parameters 2, uncheck the box "Synchronize project with client".Then uncheck teh box "Time reporting".