All translations

Jump to: navigation, search

Enter a message name below to show all available translations.

Message

Found 2 translations.

NameCurrent message text
 h English (en){|class=mandeflist
!Green check
|Means that the day has been fully reported. Days without reporting requirements, such as weekends or public holidays, are marked green from the outset.
|-
!Red circle
|Means that the day does not meet the reporting requirements that have been set.
|-
!Orange exclamation mark
|Means that the day is marked as Not ready. Not ready days are not updated to the accounting system.
|-
!Black-White
|Means that the day is a future day.
|}
If time has been reported for a particular day, this is indicated by a line under the date. Clicking on the day displays a summary of the reported time for that day in the right-hand window.
 h Swedish (sv){|class=mandeflist
!|Grön bock
|Betyder att dagen är färdigrapporterad. Dagar utan rapporteringskrav, exempelvis helgdagar, är redan från början grönmarkerade.
|-
!Röd cirkel
|Betyder att dagen inte uppfyller det rapporteringskrav som har satts.
|-
!Orange utropstecken
|Betyder att dagen är markerad som stoppad. När dagen är stoppad kan den inte läsas in till ekonomisystemet.
|-
!Svart-vitt
|Betyder att dagen ännu inte har inträffat.
|}
Om tid har rapporterats på en dag så illustreras det genom strecket under datumet. Genom att klicka på dagen visas i det högra fönstret en sammanställning av den rapporterade tiden den dagen.