Translations:Pocket Time and Time log/9/en
From Marathon Documentation
Revision as of 16:01, 26 February 2016 by TR (talk | contribs) (Created page with "You can go back to previous days by swiping to the right. A green line under the day indicates that the day is fully reported and complete, whether completed with the time log...")
You can go back to previous days by swiping to the right. A green line under the day indicates that the day is fully reported and complete, whether completed with the time log or not. Yellow line means that a day is marked as not ready. A red line means that a day is not completed or reported at all.