Translations:Resource planning/51/en
From Marathon Documentation
Revision as of 14:51, 29 September 2016 by FuzzyBot (talk | contribs) (Importing a new version from external source)
If the parameter ”Show resource planned in project analysis” is checked (in System: Base register/Pro/Parameters/Clients and projects), two columns are shown in the project analysis view: Planned 1 and WIP 2.