Translations:WIP valuation/17/en

From Marathon Documentation
Revision as of 15:15, 13 June 2018 by FuzzyBot (talk | contribs) (Importing a new version from external source)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

When reservations are done and all projects are approved, lock the valuation of the period in WIP valuation Adm. Select the period's valuation in the list, clock Open, check the box “Reservation locked” and thereafter Save.