Translations:FAQ:PRO/Queries-Client and project/6/en

From Marathon Documentation
Revision as of 12:17, 20 June 2018 by FuzzyBot (talk | contribs) (Importing a new version from external source)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Can I block a project from time reporting?

Yes, on the project in Base registers/Pro/Client and projectIn the tab Parameters 2, uncheck the box "Synchronize project with client".Then uncheck the box "Time reporting".