Gjør kreditkontroll ved bekreftelse av budsjett
From Marathon Documentation
Revision as of 09:56, 22 January 2019 by TR (talk | contribs) (Created page with "{{News |Gjør kreditkontroll ved bekreftelse av budsjett |module=System |group=Grunnregister |version=546 |revision=45687 |case=1062658 |published=2019-01-16 }}")
Gjør kreditkontroll ved bekreftelse av budsjett
Published | 2019-01-16 |
---|---|
Module | System |
Version | 546 |
Revision | 45687 |
Case number | 1062658 |
Perform credit check when confirming estimate
Activated with the parameters under Base registers/Med/Parameters in tab General: "Include project estimate purchases" and "Include project estimate fees".
The amount on the estimate is added to the WIP PRO sum and if the credit limit is passed, the estimate can not be confirmed.
This also requires that the parameter "Include only confirmed estimates" is checked under Base registers/Pro/Parameters/Project estimate.