News:Do not allow time reporting that exceeds estimated time

From Marathon Documentation
Revision as of 23:58, 21 October 2015 by TL (talk | contribs) (Created page with "__FORCETOC__ <translate> {{News |Do not allow time reporting that exceeds estimated time |module=Project accounting |revision=26323 |case=694670 |published=2013-11-07 |group=...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search


Do not allow time reporting that exceeds estimated time
Published 2013-11-07
Module Project accounting
Version unknown
Revision 26323
Case number 694670
News link 3632

Parametric setting on project in Backoffice: Base registers/Pro/Clients-Projects, tab Parameters 2: Do not allow time reporting that exceeds the estimate.

If the parameter is checked,  the system controls every save in Marathon Time. If the saved amount of hours exceeds the estimated amount, an error message is shown and save is not possible.

The control is also made in Marathon Pocket (time reporting in the mobile phone).

If the parameter Include only confirmed estimates (in Backoffice: Base registers/Pro/Parameters, tab Estimate) is checked, the control is only including confirmed estimates.