News:Do not allow time reporting that exceeds estimated time
From Marathon Documentation
Revision as of 23:58, 21 October 2015 by TL (talk | contribs) (Created page with "__FORCETOC__ <translate> {{News |Do not allow time reporting that exceeds estimated time |module=Project accounting |revision=26323 |case=694670 |published=2013-11-07 |group=...")
Do not allow time reporting that exceeds estimated time
Published | 2013-11-07 |
---|---|
Module | Project accounting |
Version | unknown |
Revision | 26323 |
Case number | 694670 |
News link | 3632 |
Parametric setting on project in Backoffice: Base registers/Pro/Clients-Projects, tab Parameters 2: Do not allow time reporting that exceeds the estimate.
If the parameter is checked, the system controls every save in Marathon Time. If the saved amount of hours exceeds the estimated amount, an error message is shown and save is not possible.
The control is also made in Marathon Pocket (time reporting in the mobile phone).
If the parameter Include only confirmed estimates (in Backoffice: Base registers/Pro/Parameters, tab Estimate) is checked, the control is only including confirmed estimates.