Translations:FAQ:PRO/Queries-Client and project/6/en

From Marathon Documentation
Revision as of 11:36, 26 October 2015 by TR (talk | contribs)

Jump to: navigation, search
  • Can I block a project from time reporting?

Yes, on the project in Base registers/Pro/Client and projectIn the tab Parameters 2, uncheck the box "Synchronize project with client".Then uncheck the box "Time reporting".