A new column for Cost centre has been added to the Standard PRO report, Age distributed WIP list.
The column is only shown in the report if the Printout is set to Spreadsheet and the checkbox Split per project is checked.
To get the new column in a printed report, check the checkbox called Show cost centre (Spreadsheet).