Translations:Enter clients and projects/5/en
From Marathon Documentation
Revision as of 16:25, 15 December 2015 by Diana Nayis (talk | contribs) (Created page with "The system is constructed such that the majority of the client data is synchronised to the projects. The synchronised fields are marked with a green dot. It is possible to dea...")
The system is constructed such that the majority of the client data is synchronised to the projects. The synchronised fields are marked with a green dot. It is possible to deactivate the synchronisation in the Client record, under the tab Parameters 2. Projects created afte rthat will not be synchronised with the client.