Translations:Resource planning/51/en
From Marathon Documentation
Revision as of 16:31, 15 December 2015 by Abdalla Yasin (talk | contribs) (Created page with "If the parameter ”Show resource planned in project analysis” is checked (in System: Base register/Pro/Parameters/Clients and projects), two columns are shown in the projec...")
If the parameter ”Show resource planned in project analysis” is checked (in System: Base register/Pro/Parameters/Clients and projects), two columns are shown in the project analysis view: Planned 1 and WIP 2.