Translations:Resource planning/65/en
From Marathon Documentation
Revision as of 09:49, 9 March 2026 by FuzzyBot (talk | contribs) (Importing a new version from external source)
If time is to be planned on a weekly basis, all time is added on Monday, and the overview is displayed when the ‘Week’ level of detail is selected. The project ID can be entered or selected by clicking in the search box (with three lines and dots), hours and any fee codes can be entered, and comments can be added. Select OK to save or Cancel to exit.
