Translations:Resource planning/72/en

From Marathon Documentation
Revision as of 09:49, 9 March 2026 by FuzzyBot (talk | contribs) (Importing a new version from external source)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Selection - Show

Planned time If the box for planned time is checked, it will be displayed in the resource-planned time.
Used time If the box for used time is checked, the time reported in the Time Reporting will be displayed.
Empty rows If Empty rows is checked, employees who do not have any time planned/reported during the week will also be displayed.
Sums Summarises the planned and reported time for the day. The total planned and spent time for the entire week is displayed under the employee's name.
Do not sort Tick/untick if the list should be sorted alphabetically by project or not.