Translations:Approval of suppliers/11/en

From Marathon Documentation
Revision as of 09:16, 8 October 2026 by FuzzyBot (talk | contribs) (Importing a new version from external source)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • All tabs that need confirmation are red.
  • All fields that have been changed and need confirmation are marked with a full green shield.
  • Hover the mouse pointer over a field that has been changed to see its previous value.
  • Each red tab must be confirmed by clicking the confirmation button at the bottom of the relevant tab.
  • The user must enter their password to save the supplier.