News:Cost centre in Age distributed WIP list
From Marathon Documentation
Revision as of 12:00, 18 January 2023 by FuzzyBot (talk | contribs) (Updating to match new version of source page)
Cost centre in Age distributed WIP list
Published | 2023-01-18 |
---|---|
Module | Projects |
Version | 546W2212 |
Revision | 0 |
Case number | CORE-4208 |
Cost centre in Age distributed WIP list
A new column for Cost centre has been added to the Standard PRO report, Age distributed WIP list.
The column is only shown in the report if the Printout is set to Spreadsheet and the checkbox Split per project is checked.
To get the new column in a printed report, check the checkbox called Show cost centre (Spreadsheet).
The column is placed next to Project manager in the printed out report.