News:Cost centre in Age distributed WIP list

From Marathon Documentation
Jump to: navigation, search

Cost centre in Age distributed WIP list
Published 2023-01-18
Module Projects
Version 546W2212
Revision 0
Case number CORE-4208

Cost centre in Age distributed WIP list

A new column for Cost centre has been added to the Standard PRO report, Age distributed WIP list.

The column is only shown in the report if the Printout is set to Spreadsheet and the checkbox Split per project is checked.

To get the new column in a printed report, check the checkbox called Show cost centre (Spreadsheet).


The column is placed next to Project manager in the printed out report.