FAQ:PRO/Registration, corrections and updatings

From Marathon Documentation
Revision as of 19:06, 23 November 2015 by TR (talk | contribs) (Created page with "*I updated by mistake. Can I undo it? No, unfortunately not.")

Jump to: navigation, search
FAQ item
Published unknown
Module Project
Version 546
Revision unknown
  • We get a message that we have exceeded our licences and soon will be blocked?

A check in the box "Time reporting" in the employee registers is counted as a licence. Remove teh check from those who do not need it. If you have more time reporters than licences, contact Kalin Setterberg. Also contact them to remove the warning.

  • I have removed unnecessary time reporters but the warning about licnces remain.

Contact Kalin Setterberg; they will have to remove the warning manually.

  • I accidentally clicked on Update everything instead of Update all, can I undo that?

Updated time cannot be undone. Kalin Setterberg can reread a backup for a charge.

  • Can I correct as many records I want?

No, teh maximum is 1 000 rows at a time. Split the correction into smaller parts, eg, by correcting per project, or per a certain period.

  • Can I correct or move a part of a purchase?

No, the complete purchase has to be moved or corrected. If you want to move parts of it, go to the bookkeeping, Correct the supplier's invoice by debiting and crediting the project purchase account.

  • I want to correct several records at one time.

Press the Ctrl-key and select the records, or press the left mouse button and drag over the records. Then click on Batch change

  • Can I move non project related time (900-codes)to external projects?

No, it can only be moved to not project related projects (9-projects). But if you at the time for moving change the fee code to an external one, the moving is ok.

  • Can I move time from external projetcs to not project related ones?

No, external time can only be moved to external, internal, group common and speculation projects. But if you at the time of moving also change the fee code to a 900-code, the moving will be Ok.

  • I updated by mistake. Can I undo it?

No, unfortunately not.

  • Det ligger inga övrigt poster att uppdatera fastän det finns registrerat?

Man måste först uppdatera arvodet, sedan går övrigt posterna att uppdatera.

  • Jag vill avgränsa tiden som ska uppdateras till och med ett visst datum.

När du klickar på Uppdatera allt får du välja det utförandedatum tiderna ska uppdateras till och med.

  • I listan med tider att uppdatera står inget belopp, varför?

Beloppet bestäms i och med uppdateringen och det är då systemet beräknar timpriset.

  • Vad betyder status Stoppad?

Medarbetaren har stoppat dagen i Tidrapporteringen och då kan inte tiderna för den dagen uppdateras. Genom att ta bort stoppmarkeringen går dagen att läsa in.

  • Det ligger gamla tidposter i Uppdatera på gamla medarbetare, hur kan jag får bort dem?

Om du inte vill eller har möjlighet att gå in och tillfälligt aktivera medarbetarna och sedan uppdatera tiden, så kan vår konsultationsavdelning göra en rensning. Kontakta supporten för mer information.

  • Jag kommer inte in i Uppdatera, det står att det är upptaget?

Någon annan är inne och uppdaterar samtidigt. Endast en användare kan vara inne i programmet åt gången.