News:Control of future credit exceedings
From Marathon Documentation
Control of future credit exceedings
Published | 2013-01-17 |
---|---|
Module | Media |
Version | unknown |
Revision | 23427 |
Case number | 636445 |
News link | 2986 |
The function is used in Base registers/MED/Parameters, tab General. By setting fixed additional times for client invoicing per media type and for invoice payments, estimation of future credit need will be possible.
In all places where we today check credit usage and block when credit has been exceeded, above shown warning appears if the system notices an estimated credit exceeding in the future.
The screen that is shown when one presses the CREDIT field is now divided in three parts.
Credit | shows the same information as was shown before, but with the addition of estimated credit exceeding if the system has noticed one |
---|
Credit graph shows a graph with one curve for credit limit and one for credit usage. The time axle in the window shows 2 months; later transactions are shown when the window is enlarged. The scale on the left axle is adjusted after the curves and uses thus the whole area |
List includes all transactions that form the base for credit usage. The credit date is the date when the transaction is taken into the graph. In the column Acc accumulated credit usage is shown. When the usage exceeds credit limit, it is marked with red |
In Media credit two new columns are shown; estimated credit exceeding and estimated maximal exceeding. There is also a new function field CREDIT , that shoews the same information as CREDIT in Media plans