| Confirm | When an estimate is confirmed, it is saved with date and username. A parameter controls if it shall be required that an estimate is confirmed before it can be used in the analysis tab, reports, etc. |
| Delete confirmation | A confirmed estimate cannot be changed, but you can delete the confirmation if you need to change something. If it is confirmed again, it will get a new confirmation date and username. |
| Activate | Possibility to activate a deactivated cost estimate |
| Deactivate | If a project has several estimates, you can deactivate those revisions that should not be included in analysis and reports etc. |